Henry Ott ConsultantsElectromagnetic Compatibility Consulting and Training |
Index of Updates
February 2013: p. 229. March 2013: p. 20. October 2013: p. 242. December 2013: pp. 252, 715. February 2014: p. 100. March 2014: p. 225. May 2014: pp. 328, 329, 343, 344. January 2015: pp. 606. December 2015: pp. 339. January 2016: pp. 329, 812. December 2016: p. 820. January 2017: p. 354. |
Some of these errors have been corrected in later printings If you are aware of any errors or typos please bring them to my attention and I will include them here.
Page 20, first paragraph. “The ITE and ISM standards can be accessed from the Industry Canada home page by following the following links: A-Z Index/Spectrum Management and Telecommunications/Official Publications/Standards/Interference-Causing Equipment Standards (ICES). The telecom standard can be accessed from the Industry Canada home page by following the following links: A-Z Index/Spectrum Management and Telecommunications/Official Publications/Standards/Terminal Equipment-Technical Specifications List.” should read: “The ITE and ISM standards can be accessed from the Industry Canada Spectrum Management and Telecommunications page (www.ic.gc.ca/spectrum) by following these links in the sidebar: Official Publications/Standards/Interference-Causing Equipment Standards (ICES). The telecom standard can be accessed from the Industry Canada Spectrum Management and Telecommunications page (www.ic.gc.ca/spectrum) by following these links in the sidebar: Official Publications/Standards/Terminal Equipment-Technical Specifications List.” Page 100, Problem 2.3, first paragraph, last line. "C12<<C10" should be "C12<<C1G." Page 225, last paragraph, last line. "magnesium" should be "manganese". Page 229, Figure 5-26. "L-filter" should be "L-C filter". Page 242, Eq. 6-4b. The number '2' should be deleted from the denominator. Page 243, Table 6-1, second to last line, “Mumetal (1 (kHz)” should be “Mumetal (1 kHz).” Page 252, Eq. 6-22. the first denominator “E1” should be “Et” Page 259, 2nd line from bottom of 1st paragraph, "reflection loss in the primary shielding" should read "reflection loss is the primary shielding" Page 263, third paragraph, sixth line, "relativity permeability" should be "relative permeability". Page 320, Equation 7-2, Denominator “Ia” should be “IA”. Page 328, third line from bottom. "290°K" should read "290 K" Page 329, second line from top. "290°K" should read "290 K" Page 329, Figure 8-1, horizontal axis. "KΩ" should be "kΩ." Page 339, 3rd paragraph, 2nd to last line. "10 times (3 dB)" should be "10 times (10 dB)" Page 343, Problem 8.1. "290°K" should read "290 K" Page 343, Problem 8.2.a. "300°K" should read "300 K" Page 343, Problem 8.2.b. "373°K" should read "373 K" Page 344, Problem 8.6. "290°K"should read "290 K" Page 344, Problem 8.7, second line. “3.3 kH” should be “3.3 kHz”. Page 353, Figure 9-4, caption first line, “noisaless” should be “noiseless”. Page 354, Second paragraph, last line, "affect of" should be "effect of". Page 355, Figure 9-6, x-axis, “1m” and “10m” should be “1 M” and “10 M”. Page 363, sentence before equation 9-54, “temperature of a several amplifiers” should be “temperature of several amplifiers”. Page 384, last paragraph, second to last line, “the inductance is” should be “the inductive reactance is”. Page 390, Equation 10-10, “Ll” should be “L1”; the subscript should be the number one, not the letter l. Page 406, fourth line from top, “higher then expected” should be “higher than expected”. Page 500, first line in third paragraph, "the Fourier spectrum (Eq. 15-2)," should read "the Fourier spectrum (Eq. 12-5)." Page 586, Figure 15-3, last item, “Flate Plate” should be “Flat Plate”. Page 597, Table 15-4, column headings should be: Voltage Clearance Distance mm in 2000 2 1/16 Page 606, second line. “temporarlity” should be “temporarily” Page 648, second paragraph, second line, “More that eight” should be “More than eight”. Page 669, sixth paragraph, first line. ' “Chain Saw “Test:' should be ' “Chain Saw” Test:'. The phrase “Chain Saw” should be the only words within the quotes. Page 715, Fig. 18-23. The label for the bottom solid line should read "FCC/CISPR-B" at both ends of the line, not "FCC/CISPR-A." Page 783, second line from top, “being measures” should be “being measured”. Page 812, Problem 12.3. "64 mA" should be "57 mA". Page 819, “Problem 5.11” should be “Problem 15.11”. Page 819, “Problem 5.12” should be “Problem 15.12”. Page 820, Problem 16-9. “where signal traces change from layers from 4 to 5.” should be “where signal traces change layers from 4 to 5.”
Henry Ott Consultants 48 Baker Road, Livingston, NJ 07039 Phone: 973-992-1793, Fax: 973-533-1442 email: hott@ieee.org January 4, 2017 (jw) |
|||